Document Type : Research Paper
Authors
Civil and Architectural Engineering Department, An-Najah National University Nablus, P.O. Box: 7, Palestine
Abstract
The development of urban areas in Palestine is usually linked with the implementation of municipal road projects. The assessment of life cycle costs for municipal roads is presented in this research. This paper aims to highlight the main factors and their impact on the cost overrun during the different life cycle phases of road projects and therefore proposes recommendations that aim at reducing the differences between the estimated and actual costs. A study was conducted across twenty-six municipalities in the various regions of the West Bank. Over the study period of 2016 to 2018, there were 123 implemented road projects within these municipalities, where sixty-three of these projects surpassed their initial cost estimates and encountered cost overrun by an average of 26.9%. Among these, forty-seven projects were deemed suitable for research based on the assessment of the filled questionnaires by these municipalities. The main factors leading to cost overruns include challenging terrain, lack of specialized engineering offices for design and tender preparation, the timing of the tender release, awarding projects solely based on the lowest bids, changes during implementation, and financial constraints. Project cost measures that rely on professional management practices need to be considered in the planning designing, tendering, and implementing phases.
Keywords
- Municipal Development Program (2019-2022). Final Report, Municipal Development and Lending Fund (MDLF), Ramallah, Palestine, (2023).
- Santos, J. and Ferreira, A., Life-cycle cost analysis system for pavement management at project level. International Journal of Pavement Engineering, 14(1) (2013), 71-84. https://doi.org/10.1080/10298436.2011.618535
- Molenaar, K.R., Programmatic cost risk analysis for highway megaprojects. Journal of construction engineering and management, 131(3), (2005), 343-353. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(343)
- Creedy, G., Skitmore, M. and Wong, J., Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management-ASCE, 136(5), (2010), 528-537. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000160
- Babashamsi, P., Yusoff, N.I.M., Ceylan, H., Nor, N.G.M. and Jenatabadi, H.S., Evaluation of pavement life cycle cost analysis: Review and analysis. International Journal of Pavement Research and Technology, 9(4), (2016), 241-254. https://doi.org/10.1016/j.ijprt.2016.08.004
- Shane, J.S., Molenaar, K.R., Anderson, S. and Schexnayder, C., Construction project cost escalation factors. Journal of Management in Engineering, 25(4), (2009), 221-229. https://doi.org/10.1061/(ASCE)0742-597X(2009)25:4(221)
- Kaliba, C., Muya, M. and Mumba, K., Cost escalation and schedule delays in road construction projects in Zambia. International journal of project management, 27(5), (2009), 522-531. https://doi.org/10.1016/j.ijproman.2008.07.003
- Altaf, M., Alalaoul, W.S., Musarat, M.A., Hussain, A., Saad, S., Rabbani, M.B.A. and Ammad, S., Evaluating the awareness and implementation level of LCCA in the construction industry of Malaysia. Ain Shams Engineering Journal, 13(5), (2022), 101686. https://doi.org/10.1016/j.asej.2021.101686
- Khodeir, L.M. and El Ghandour, A., Examining the role of value management in controlling cost overrun [application on residential construction projects in Egypt]. Ain Shams Engineering Journal, 10(3), (2019), 471-479. https://doi.org/10.1016/j.asej.2018.11.008
- Williams, T. P. Predicting final cost for competitively bid construction projects using regression models. International Journal of Project Management, 21(8), (2003), 593-599. https://doi.org/10.1016/S0263-7863(03)00004-8
- Odeck, J., Cost overruns in road construction—what are their sizes and determinants? Transport policy, 11(1), (2004), 43-53. https://doi.org/10.1016/S0967-070X(03)00017-9
- Chan, A., Economic and Environmental Evaluations of Life Cycle Cost Analysis Practice: A Case Study of Michigan DOT Pavement Projects. Unpublished M.Sc. thesis, University of Michigan, (2007). https://api.semanticscholar.org/CorpusID:108681879
- Siemiatycki, M., Cost overruns on infrastructure projects: Patterns, causes, and cures. Institute on Municipal Finance and Governance, (2015).
- Abou Rizk, S.M., Babey, G.M. and Karumanasseri, G., Estimating the cost of capital projects: An empirical study of accuracy levels for municipal government projects. Canadian Journal of Civil Engineering, 29(5), (2002), 653-661. https://doi.org/10.1139/l02-046
- Chileshel, N. and Berko, P.D., Causes of project cost overruns within. In Proceedings 51" Built Environment Conference (Vol. 18, (2010, July.), p. 20).\
- Mbaabu, P.P., Factors influencing implementation of road construction projects in Kenya: a case of Isiolo County, Kenya (Doctoral dissertation, University of Nairobi, Kenya), (2012).
- Al-Hazim, N. and Salem, Z.A., Delay and cost overrun in road construction projects, Jordan. International Journal of Engineering & Technology, 4(2), (2015), p.288. https://doi.org/10.14419/ijet.v4i2.4409
- Mulenga, E. and Bekker, M.C., Causes of cost overruns of Municipal Infrastructure Grant funded projects at the OR Tambo District Municipality. Journal of Public Administration, 50(2), (2015), 333-344.
- Santoso, D.S. and Gallage, P.G.M.P., Critical factors affecting the performance of large construction projects in developing countries: A case study of Sri Lanka. Journal of Engineering, Design and Technology, 18(3), (2020), 531-556. https://doi.org/10.1108/JEDT-05-2019-0130
- Enshassi, A., M. Kumaraswamy, and J. Al-Najjar. "Factors influencing time and cost overruns in construction projects in the Gaza Strip: Consultant's view." International Journal of Construction Project Management, (2010). https://api.semanticscholar.org/CorpusID:110961712
- Enshassi, A., Al‐Najjar, J. and Kumaraswamy, M., Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of property and Construction, (2009). https://doi.org/10.1108/13664380910977592
- Mahamid, I., and Bruland, A., Cost deviation in road construction projects: The case of Palestine, Construction Economics and Building 12 (1), (2012), 58-71. https://doi.org/10.5130/AJCEB.v12i1.2427
- Mahamid, I., Common risks affecting time overrun in road construction projects in Palestine: Contractors' perspective. Australasian Journal of Construction Economics and Building, The, 13(2), (2013), 45-53. https://doi.org/10.5130/AJCEB.v13i2.3194
- Dmaidi, N., Mahamid, I. and Shweiki, I., Identifying the critical problems of construction contracting management in Palestine. Jordan Journal of Civil Engineering, 10(1), (2016).
- Al Hallaq, K., Critical Factors Causing Contractor's Business Failure in Gaza Strip. Journal of Engineering Research and Technology, 6(2), (2019).
- Issa, A., Bdair, R. and Abu-Eisheh, S., Assessment of compliance to planned cost and time for implemented municipal road projects in Palestine. Ain Shams Engineering Journal, 13(2), (2022), 101578. https://doi.org/10.1016/j.asej.2021.09.005
- Al-Makharzah, M., Assessment of Life Cycle Cost of Roads Projects in Palestine: A Case Study of the Palestinian Municipalities. Unpublished M.Sc. thesis, An-Najah National University, (2020). https://hdl.handle.net/20.500.11888/17634
- Ondari, P.O. and Gekara, J.M., Factors influencing successful completion of roads projects in Kenya. International Journal of Social Sciences and Entrepreneurship, 1(6), (2013), 26-48. https://api.semanticscholar.org/CorpusID:55663332
- Kehinde, O., Afolabi, O., and Omogbolahan, I. Evaluation of the effect of project management techniques on road construction projects in Nigeria. European Project Management Journal, 7(1), (2017), 3-12. https://api.semanticscholar.org/CorpusID:203598072