Author
Abstract
The Establishment manger in need in this time for following the scientific study to evaluate the duty of the factory .
This research aims to study the status of the factories which belong to construction fied in Iraq , as the systeme of oplication of ideal production mangment and evaluat the working duty of those fatories .
To achieve the aim of research , we design a computer program for measuring working duty of factory which belong to construction field .
Also we discover that some factors controlled the process of production specifying in the factories which belongs to construction field in Iraq and these factors are (supplying by the electricity in continual way which gave warranty to continual of production process .
The results of this program has been designed to measure the work duty of the factory which belongs to construction field according to agroup of pointer which has been resulted from the theortical study of the subjcet . and that has been applicated in cofa cement factory by measuring work duty of 2004 through that has been reached to some results from these the low of benfit scription of free enargy of the factory to 27.5% . But if the factory has been supplied by the electricity in continual way so the scription would rise to 90.5% and this the duty scription of one production line which is working now .
At the end we have been reached to some advices, from these measure the work duty of the factory , seasonly and yearly to evalute the working passing the point of weekness . also has been reached to some sugestions to next resarch .